top of page
Raw Material

Backed by two mining concessions and cooperate with other concession holders, PT. MPK committed to be a long term player within the industry.  The company is able to produce constant quantity per month basis.

Production

The company has installed two production lines with the output of 12,000 Metric Tonnes annually. It has a continuous flow production process with a minimum amount of operator.

 

Logistic

The finished goods are packed in a 2-tonnes jumbo bags and shipped in containers worldwide from Trisakti Port, Banjarmasin, South Kalimantan.

 

© 2020 by PT. Mineral Premier Kalimantan. 

bottom of page